BOQ Audit Interior Fit Out¶
Fit-out BOQ audited with sector-specific spec depth (RCP coordination, false ceiling fascia, joinery EO pricing, finish brands), bids levelled, hold-points and escalation clauses generated
The fit-out quote looks fine. Until someone checks the ceiling and the joinery.
- Area: Operations
- Time savings: Typical run: 1-2 days for single BOQ; 2-3 days for multi-bid leveling
- Try it: "Interior fit-out BOQ received (commercial office, retail, hospitality, institutional fit-out) — needs auditing before award or payment"
- Compounding: Each run refines templates and context — 3 automated steps improve with accumulated data
- Frequency: Per trigger event
What BOB does¶
- Validate fit-out context — confirm tenant tier, RCP availability, mock-up policy. Flag the sector context pack for the audit
- boq-audit (audit-boq) → using
--alias {matter-alias}and the fit-out context pack, run the four audit passes; spec-gap pass uses the NLM-grounded fit-out brand list, EO-pricing pass uses fit-out patterns; every flag carries an NLM citation - boq-audit (level-bids) → with fit-out SOV extensions, split joinery into Fixed/Movable/Fascia, ensure mock-up line item appears
- Review with interior designer + owner-rep — fit-out audits often require designer sign-off on finish specifications and brand acceptability
- Issue findings to contractor — 7-day response window. Specifically request mock-up scheduling.
- boq-audit (inspection-checklist) → fit-out checklist heavily emphasises mock-up approval gates, MEP-RCP coordination at every fixture, and finish verification at delivery
- Owner-rep + designer make award decision — designer carries authority on aesthetic intent; owner-rep on commercial. Award is binding only at this step