Eot Claims Preparer¶
FIDIC Extension of Time Claims
You have 28 days to notify. Miss it and the claim is dead.
- Area: Operations
- Level: expert
- Roles: Operations Manager
- Time savings: ~3-5 days manual drafting → ~45 min automated
- Try it: "Draft a 28-day notice for a delay caused by late Employer drawings"
- Compounding: Each claim builds precedent library — rebuttal patterns and evidence templates improve
- Frequency: Per delay event · per claim cycle
Inputs¶
- 📝 delay-event.md
- 📊 tia_report.md
- 📁 site-records
What BOB does¶
- Establish entitlement basis
- Check 28-day notice window
- Draft notice letter
- Review and sign notice
- Prepare detailed claim
- Anticipate rebuttals
Outputs¶
- 📨 eot_notice.md
- 📕 eot_claim.md
- ✅ compliance_check.md
Built on the eot-claims-preparer skill.